All projects05  Whole-home

Brentwood Open-Plan Remodel

Engineered wall removal joined the kitchen and living spaces in an existing home.

Location

Brentwood, CA

Year

2020

Area

1,400 sq ft

Status

Completed · placeholder

Brentwood Open-Plan Remodel

Fact sheet

ClientIllustrative private client
Duration12 weeks
ScopeLoad-bearing wall removal, engineered beam, interiors
MaterialsWhite oak, plaster, stone
PhotographyIllustrative images · placeholder project
01

Before

A load-bearing wall divided the kitchen from the rooms the family used most.
02

The renovation

We coordinated engineering and permits, installed structural support and repaired flooring and finishes.
03

After

Cooking, gathering and daily life now share a brighter connected space.
Brentwood Open-Plan Remodel detail
Brentwood Open-Plan Remodel interior
Brentwood Open-Plan Remodel exterior

Before / After

A dated kitchen,renewed for daily life.

Finished interiorSame interior before renovationBeforeAfter
Drag the line to compareIllustrative kitchen before / after

Next project

All projects

Malibu Primary Suite Addition

Malibu Primary Suite Addition